Poly 200 Instructions

Poly 200 Instructions

WARNING! Wear protective gloves, clothing, eyes, and protection when using this product. Proper ventilation is required for use.

See the SDS sheet for more information, available at PerformanceCoat.net.

Store Poly 200 in a cool place two days before application 65 °F or lower.

Application is best in the morning or evening. Do not apply product in direct sunlight.

Coverage at approximately 4 MIL:

  • 1/2-gallon - 166 sq. ft.
  • .75-gallon - 250 sq. ft.
  • 1-gallon 325 sq. ft.
  • 5-gallons - 1,600 sq. ft.
  • 55-gallon drum -18,250 sq. ft.

Mixing is not required. Application is best in the morning or evening. Do not apply product in direct sunlight.

____Step 1:

Shake can before opening. Cut in the perimeter walls.

____Step 2:

Pour contents into a roller tray.

____Step 3:

Roll out evenly in one direction.

____Step 4:

Re roll in opposite direction 5-10 minutes after application.

If you desire to have aluminum oxide nonskid added to the floor broadcast aluminum oxide non-skid over the floor in lesser amounts (only in the previous section which has been back rolled a 2nd time). Taking a pinch amount apply by throwing the non-skid into the air a minimum of 5' higher. Re-bounding the non-skid off the ceiling is a good idea to get even coverage.

Note: Aluminum oxide will make the floor more slip resistant but will make it harder to clean; it should be used according to your desired needs.  

PerformanceCoat.net non-skid additive is industry standard and accepted means for creating a proper recommended OSHA 0.5 COEFFICIENT FRICTION slip resistant non-skid surface.

** Dispose of contents/container to an approved waste disposal plant **

• Typically used in heavy industrial environments

Fill out and return for warranty coverage. 

Mail to:

PerformanceDIY.com

169 North Gratiot Mt. Clemens, MI 48043

Phone: (800) 841-5580 Fax: (586) 468-8440